Projects

Electrical System Studies

Client: NETE Testing

Project Site: Kern County Justice Facility

Standard Post with Image

Project Summery:

Normal and Emergency Power Upgrade: Normal distribution rated 4000A and Emergency Generator rated 1500KW.  System Study including Short Circuit, Protective Device Coordination, and Arc Flash Analysis; Arc Flash Labels provided.

Electrical System Study & Acceptance Testing

Client: Baker Electic

Project Site: El Centro Medical Center

Standard Post with Image

Project Summery:

Central Utility Plant Upgrade: System Study including Short Circuit, Protective Device Coordination, and Arc Flash Analysis; Arc Flash labels generated. Electrical acceptance testing on Transformers, Circuit Breakers, Switchboards, Feeders, Grounding System, Cables, Fuses and Motor Starters.

1 2 3 4 5 6 7 8 9 10