Normal and Emergency Power Upgrade: System Study including Short Circuit, Protective Device Coordination, and Arc Flash Analysis; Arc Flash labels generated. Existing relays were replaced with SEL-311,700G, 551, 751, and Low Voltage Breakers. .
Electrical System Study
Client: National Electrical Testing & Engineers (NETE)
Project Site: Joseph Jensen Water Treatment Plant, Granda Hills, CA
Electrical System Study & Acceptance Testing
Client: Baker Electric
Project Site:Pechanga Resort & Casino, Temecula, CA
Resort Hotel Expansion: System Study including Short Circuit, Protective Device Coordination, and Arc Flash Analysis; Arc Flash labels generated. Electrical Acceptance Testing on Transformers, Circuit Breakers, Switchboards, Switches,Grounding Systems, Ground Fault Interrupters, Cables, Fuses and Motor Starters.