Projects

Electrical System Study

Client: AK Electrical

Project Site: March Air Force Base, Riverside, CA

Standard Post with Image

Project Summery:

Joint Regional Deployment Processing Center – Phase I Upgrade: System Study including Short Circuit, Protective Device Coordination, and Arc Flash Analysis; Arc Flash labels generated.  Electrical Acceptance Testing on ground fault interrupters.

Electrical System Study & Testing

Clients: Baker Electric; Royal Electric

Project Site:Los Angeles International Airport, CA

Standard Post with Image

Project Summery:

System Study including Short Circuit, Protective Device Coordination, and Arc Flash Analysis; Arc Flash labels generated. Electrical Acceptance Testing on switchboards, panelboards, transformers, cables circuit breakers, grounding systems, ground fault interrupters,

1 2 3 4 5 6 7 8 9 10