Electrical Engineering for a new 7 story mixed use building. The Onyx design project included utility coordination, subterranean parking, residential and retail spaces.

Electrical System Studies and Testing
Client: Jade Enterprises
Project Site:“Topaz” Building, Los Angeles, CA

Electrical Engineering for a new 7 story, mixed use building. The Topaz design project included utility coordination, subterranean parking, residential and retail spaces.